Diagnosis Procedure
1.Check harness continuity (open circuit)

Is the inspection result normal? Yes (present error)>>check can system type decision again.
Yes (past error)>>error was detected in the main line between the data link connector and the a/c auto amp.
No >> repair the main line between the data link connector and the a/c auto amp.
Main line between ipdm-e and dlc circuit
Ecm branch line circuitOutput speed sensor
Exploded View
Transaxle assembly
Output speed sensor
O-ring
: Vehicle front
: Always replace after every
disassembly.
: NВ·m (kg-m, in-lb)
: Genuine NISSAN CVT Fluid NS-3
Removal and Installation
REMOVAL
Disconnect the output speed sensor harness connector.
Remove ...
Additional service when replacing ecm
Description
When replacing ECM, the following procedure must be performed. (For details,
refer to EC-135, "Work Procedure".)
PROGRAMMING OPERATION
NOTE:
After replacing with a blank ECM, programming is required to write ECM
information. Be sure to follow the procedure
to perform t ...
Steering gear and linkage
Exploded View
REMOVAL
Steering gear assembly
Front suspension member
Front
Removal and Installation
REMOVAL
Set steering wheel to the straight-ahead position.
Remove floor cover (1).
Lower shaft assembly (2).
Remove the lower shaft assembly bo ...