Diagnosis procedure
1.Check connector
Is the inspection result normal? Yes >> go to 2.
No >> repair the terminal and connector.
2.Check harness for open circuit
Is the measurement value within the specification? Yes >> go to 3.
No >> repair the tcm branch line.
3.Check power supply and ground circuit
Check the power supply and the ground circuit of the TCM. Refer to TM-234, "Diagnosis Procedure".
Is the inspection result normal? YES (Present error)>>Replace the TCM. Refer to the TM-263, "Removal and Installation".
YES (Past error)>>Error was detected in the TCM branch line.
NO >> Repair the power supply and the ground circuit.
P0125 ECT Sensor
DTC Logic
DTC DETECTION LOGIC
NOTE:
If DTC P0125 is displayed with P0116, first perform the trouble
diagnosis for DTC P0116. Refer to EC-
196, "DTC Logic".
If DTC P0125 is displayed with P0117 or P0118, first perform the
trouble diagnosis for DTC P0117 or
P0118. Refer to ...
Battery terminal with fusible link
Exploded view
Battery terminal with fusible link
Harness connector
Removal and installation
Removal
Loosen the battery terminal nuts and disconnect both battery negative and
positive terminals. Refer to
pg-50, "exploded view".
Caution:
To prevent damage to the parts, di ...
Application Download
Once connected, the NissanConnect™ App will
search your phone to determine which compatible
applications are currently installed. The user
will then choose which apps they want to bring
into their vehicle from the list of apps within the
“Manage My Apps” section of the NissanConnect
™ ...